Shah & Talati was assigned the fast paced project of manufacturing
of pre-engineered buildings by Everest Industries.
The project started in October 2013 and went into production by March 2014. The factory was designed to suit a separate entry of incoming material and fabricated material with necessary curvatures to suit large trailer movements.
The stacking area for raw material which is primarily plates was designed for a floor loading of 20 ton/sqm. The building showcases various features which Everest can provide to their customers.
Architectural, Structural, Civil Utilities, Electrical, Contract Management, Site supervision.
Year : 2013 - 2014